Cascade Christian School Jr. High School Phase 2 & 3
The $5.5M Cascade Christian School Jr. High School addition consists of two phases being built simultaneously under separate permits. The 20,000 SF, two-story structure includes six classrooms on the first floor, three of which are labs. The second level will be left unfinished and completed in a future phase once funding is acquired. Previous phases on campus included building the new 46,500 SF Jr./Sr. High School with performing arts space, auditorium, administration and a separate weight lifting building. The shell and core of the gym was also constructed to be completed in a future phase. Absher continues to help non-profit organizations such as Cascade Christian with phasing plans that will align with their fundraising efforts.